| 1.01 Authority 1.02 Purpose 1.03 Subdivision Compliance 1.04 More than one Building for Dwelling 1.05 Waiver of Compliance 1.06 Amendments 1.07 Validity 1.08 Coordination with Municipal Departments and Other Agencies 1.09 Effect of Prior Recording of Subdivision Plan
|
| |
| |
| Procedure for Submission and Endorsement of Non-Subdivision Plans(Plans Believed Not To Require Approval) |
| 3.01 General 3.02 Submission 3.03 Contents 3.04 Endorsement |
| Procedure For Submission and Approval Of Preliminary Plans |
| 4.01 General 4.02 Submission 4.03 Contents 4.04 Approval of the Preliminary Plan |
| Procedure For Submission and Approval Of Definitive Plans |
| 5.01 General 5.02 Submission 5.03 Contents 5.04 Additional Subdivision Requirements 5.05 Approval of Definitive Plan 5.06 Release of Performance Guarantee 5.07 Deviation from Approved Plan 5.08 Street Acceptance
5.05 Approval of Definitive Plan
|
| Procedures For Submission and Approval of Plans For More Than One Building For Dwelling Purposes Per Lot |
| 6.01General 6.02 Submission 6.03 Contents 6.04 Approval, Modification or Disapproval |
| |
| 7.01 Streets and Ways 7.02 Easements 7.03 Open Spaces and Protection of Natural Features 7.04 Compliance with Zoning Bylaw 7.05 Lots of Abnormal Size and Shape |
| Required Improvements For Subdivisions And Developments For More Than One Building For Dwelling Purposes Per Lot |
| 8.01 Street and Roadway Contstruction 8.02 Roadway Surfacing 8.03 Curbs and Berms 8.04 Driveway Aprons 8.05 Sidewalks 8.06 Grass Strips and Side Slopes 8.07 Bridges 8.08 Monuments and Markers 8.09 Installation of Utilities 8.10 Street Trees and Plantings 8.11 Street Lighting 8.12 Street Signs 8.13 As-Built Plans 8.14 Cleaning Up |
| |
| |
| |
| Appendix One: South Hadley Planning Board Fee Schedule Appendix Two: Typical Cross Section and Standard Details Appendix Three: A Partial List of Acceptable Types of Street and Lawn Trees and Plantings Appendix Four: Various Forms |
| Rules and Regulations - Application Review Fees |